April 1st, 2011

Pappa Doc's picture

April 1st, 2011
“Iron Horse” – Barstow, Ca – Rail Yard – 0612 hours Zulu time

During Phase 1
Connex boxes that were double stacked with lights, sentry post (cold & lonely) on the top at either end of the connex box with a ladder to provide a means of access. These were placed with excellent fields of fire. The “k” shaped concrete barricades that outline the outside perimeter.