May 4th, 2011 “Iron Horse” – Barstow, Ca – Rail Yard – 0612 hours Zulu time

Pappa Doc's picture

May 4th, 2011
“Iron Horse” – Barstow, Ca – Rail Yard – 0612 hours Zulu time

During Phase 2
Connex boxes that were double stacked with lights, sentry post (cold & lonely) on the top at either end of the Connex box with a ladder to provide a means of access. These were placed with excellent fields of fire. The “k” shaped concrete barricades that outline the outside perimeter are now complete.

757th Transportation Battalion
1205 transportation railway operation BN